Triad Has Acquired American Cleaning to Strengthen and Expand Its Service Offerings
Learn More
Case Study

Construction Delays. Triad’s Answer: “Grand Opening On Time”

Problem/Situation

As Opening Day for this hotel was rapidly approaching, construction was not on time. With reservations already booked, postponement of opening was not an option.
Download the case study to lean about Triad's approach to the situation as well as the outcomes and project follow.
“Their communications and follow-up are the best I have ever seen. They never say, ‘No.’ They never push back. They’ll work out a solution, they’ll test it, and they’ll do it.”
Operations Expert
Download the Case Study